Alataua II Elementary School campus photo & caption
Thu, 10/22/2020 - 9:53am
After heavy rains flooded the Alataua II Elementary School campus, on Monday this week, Dr. Matagi-Tofiga, along with Public Works director Faleosina Voigt, DPW engineer Falavai Ta’ase and the school PTA president conducted a site visit of the school. As a result of that site visit, DPW was able to pinpoint the source of the problem. O se vaaiga i le aoga a Alataua II Elementary i le aso Gafua o le vaiaso lenei. [ata: ASDOE]